Duration | 01.07.2004 to 30.06.2010 |
Total Cost | 36.570 Million |
Targets Achieved
- No. of water samples collected / analyzed: 501,142
- Production of water analysis report of the sampled tube well water
- inventory of running tube wells in the Punjab
- water quality data base
- water quality maps of tehsil / district level and
- water quality atlas of the Punjab province